PROJECT

Confidential Beverage Manufacturing Facility in Kildare

Food & beverage
Kildare, Ireland

Leo Lynch delivered the install of all clean process equipment and pipework for a building conversion project.  

12months
12,500m2
  • Client
    Confidential
  • Engineering
    Gray / CEL
  • Main Contractor
    John Paul Construction
€14m

Project details

Fast-track retrofit to deliver world-scale soft drink manufacturing facility for global market leader

Project Moher was a fast-track, major retrofit project which involved the conversion of an existing, large retail distribution centre in Newbridge, Co. Kildare to a world-scale soft drinks manufacturing facility. The project included the installation of a raw material bulk storage tank farm, two ATEX rated blending and batch rooms, packaging hall (bottling & crating), along with full utilities and services. 

The scope for Leo Lynch included the install of all clean process equipment and pipework within the production spaces. This totalled over 12,500m of stainless steel process pipework. During the project, our team was responsible for generation and creation of an LOD400 model based on client's design intent model, offloading, receipt verification and install of over 250 large plant items including 42No 5m tall bulk storage tanks, coordination of piping install with John Paul Construction and providing support to client’s commissioning and qualification team, which was completed across fully functioning ATEX zones. 

List of services delivered:

  • Process
  • Mechanical
  • Lift & Shift
  • Off site manufacturing
  • Modular & bespoke

List of utilities delivered:

  • Compressed air
  • Treated water 
  • Clean compressed air 
  • Ingredients  
  • Steam & Condensate 
  • Blended ingredients 
  • Process water 
  • Byproduct 
  • Chilled water 
  • Finished product  
  • Process vents 
  • Process drainage   
  • Safety showers 
  • CIP