PROJECT

Confidential Microelectronics – Tool Hook-Up 02

Advanced technology

Leo Lynch delivered a comprehensive services upgrade to a semiconductor manufacturing facility, using BIM to model and coordinate the project prior to install. 

15Months
  • Client
    Confidential
  • Leo Lynch
€9m

Project details

Major process and mechanical services upgrade project for global leader in semiconductor manufacturing

The project included installation of critical services, such as high purity gases, low purity gases, chemicals, slurries, acid waste, corrosive exhaust systems and process water systems. The project also involved sub-fab tool move-in, including expert off-loading, rigging and positioning and cleanroom tool install to the planar area. 

Leo Lynch designed the project via BIM, completing 3D modelling and co-ordinating prior to install using AutoCAD Plant 3D and NavisWorks. Key systems installed included high purity stainless steel piping (316 Electro-polished), fusion welded PVDF, Teflon Coated Ducting, PFA tubing, PVC and CPVC.

List of services delivered:

  • Process
  • Mechanical
  • Lift & Shift
  • Off site manufacturing

List of utilities delivered:

  • High purity gases
  • Low purity gases
  • Chemicals
  • Slurries
  • Acid waste
  • Corrosive exhaust systems
  • Process water systems
  • Sub-fab tool move-in
  • High purity stainless steel piping
  • Fusion welded PVDF
  • Teflon-coated ducting
  • PFA tubing
  • PVC and CPVC

Related Projects

More
Projects