PROJECT

Pfizer 3C BZA CE

Life sciences
Newbridge, Kildare

Leo Lynch delivered engineering solutions for a major secondary pharmaceutical plant expansion on a “live” process facility, including scheduled shutdowns to minimise impact on production and operations.

17months
21,250M2
  • Client
    Pfizer
  • Main Contractor
    SISK
  • Engineering
    Fluor
  • QS
    Wyeth Direct
€35m

Project details

A large-scale and complex project, delivered in a live process facility.

This project for Pfizer Newbridge (formerly Wyeth Medical) was a major secondary pharmaceutical plant expansion on a live process facility. 

The facility included HVAC, process and Sprinkler Installations, a two-storey office and conference facility to accommodate 200+ personnel, five communication rooms serving full production and product cold storeroom facilities. The system consists of full AC with constant volume with re-heats. 

Leo Lynch took an active role in the overall design process from an early stage through early contractor involvement. The team developed the P&IDs, GAs, specifications and detailed designs including ISOs. This project was designed in 3D.

List of services delivered:

  • Process 
  • Mechanical 
  • Lift & Shift
  • Off site manufacturing

List of utilities delivered:

  • Clean steam
  • Clear air
  • Process water
  • Purified water
  • Contained waste
  • Double contained waste system
  • Steam & Condensate
  • Chilled water
  • Cooling tower water
  • LPHW Steam & Condensate, 200°C

Related Projects

More
Projects

We use cookies to improve your experience on our site.
By using our site you consent to cookies.