PROJECT

PPK2 – Confidential Client, Dublin

Data centres
Dublin, Ireland

Leo Lynch provided mechanical, electrical, HVAC and AC system scope and deployment at a key data centre for a leading international technology services firm. 

16months
  • Client
    Confidential
  • Architect
    PM Group
  • Engineering
    PM Group
  • Construction
    Jacobs Engineering
€4.52m

Project details

Data centre solution spanning mechanical, HVAC and AC for global technology firm. 

Leo Lynch was responsible for the supply, installation, testing, certification and commissioning of the mechanical/HVAC and Air Conditioning systems for the Phase 1, 16 MW PPK2 Building. Mechanical systems were designed to N+1, and electrical systems designed to a combination of N+1 and N+2 redundancy. The project included a ventilation system comprising 32No full fresh air AHUs with associated exhaust fans banked at opposite ends of the building. The data halls at ground and first floor both had the same floor area. Each AHU is rated at approximately 35m/s full fresh air with own MCC Panels built into the unit on an external galvanised steel frame. 

List of services delivered:

  • Process
  • Mechanical
  • Lift & Shift
  • Off site manufacturing
  • Modular & bespoke

List of utilities delivered:

  • CCNR HVAC System & CRAC Units 
  • Electrical, SDC & battery room HVAC system  
  • Tech FSA HVAC system 
  • G-tape HVAC system 
  • FSA HVAC system and Air Conditioning system
  • Offices HVAC system 
  • Chilled water 
  • LPHW  
  • Water services 
  • Heat recovery systems 
  • Soils & wastes 
  • B.M.S controls system
  • Smoke dampers and control system 